You don't have javascript enabled. Good luck with that.
Pencarian
dermagan retak

Main Dock of Pramuka Island Cracked

The main dock of Pramuka Island, Panggang Island Urban Village, North Seribu Island Sub-district, is damaged. This 80 meters long and 5 meters width dock which was renovated almost a year ago, has cracked for 20 meters.

Hopefully it can be repaired immediately. Don't wait the dock collapsed

There are holes and tilts on some spots of cracked concrete. There is no improvement even though the condition lasts for a month.

Amrullah (38), residents of RT 02/03 Panggang Island, admitted the local residents have complained related to the dock condition. "Hopefully it can be repaired immediately. Don't wait the dock collapsed," he said, Tuesday (4/22).

Damaged Road in Rawa Badak Utara Ignored

Head of Panggang Island Urban Village, Muhammad Ali, admitted the problem has been reported to transportation sub-department.

"We hope the dock can be repaired soon," he hoped.

Linked News
Popular News indeks
  1. Jakarta Announces Rp 1 Fare for Transjakarta, MRT, and LRT on August 17

    access_time13-08-2026 remove_red_eye984 personAldi Geri Lumban Tobing
  2. Jakarta Assesses Needs and Coordinates Aid for NTT Earthquake Victims

    access_time16-08-2026 remove_red_eye698 personAldi Geri Lumban Tobing
  3. 21 Parking Locations Prepared for Indonesian Independence Day Celebrations

    access_time15-08-2026 remove_red_eye667 personAldi Geri Lumban Tobing
  4. Bank Jakarta Set to Build Communal Organic Waste Biodigesters

    access_time12-08-2026 remove_red_eye655 personAldi Geri Lumban Tobing
  5. Jakarta Prepares Aid for NTT Earthquake Victims

    access_time16-08-2026 remove_red_eye652 personDessy Suciati